Once the evaluation process has determine the type of rigging and lifting plan needed you will need to identify and gather information in regards to the following components:
  • The rigging equipment
  • Shackles, turnbuckles and slings being used
  • The weight of lift
  • Center of gravity of the load being lifted
  • Crane capacity and crane charts
  • Height, width and length of the lift
  • Atmospheric and environmental
  • onditions when the process is being performed
  • Edges and corners of the load. It is important to evaluate all the geometry of the item being lifted
  • Sling angles
  • Load angle factor
  • Floor loading capacity
  • Determine how to rig the load using good rigging practices
  • Identify and make sure tha the attachment points and load can withstand the forces created by the rigging gear attachment
  • Work zone safety
  • Evaluate hazards to determine consequences resulting from collision, upset, or dropping the load